daveyresourcegroup.com
Engineered Right-of-Way Maintenance
Effective line clearance programs are holistic. We help you reduce
workloads, off-ROW hazard trees, and tree-conductor conflicts
through a removal program that is based on:
• Safety
• Tree species
• Growing site
• Line construction
• Outage potential
The DRG Difference
Engineered work plan
+ efficient customer interaction
= 10 to 15% increase in
cost-effective vegetation removals
DRG's engineered ROW program utilizes
a Davey-trained and certified utility
forester who will inspect the right-of-
ways, identify the needed work, conduct
customer education and interaction, and
mark and document needed tree work.
This work plan can then be issued to the
line clearance contractor.
Customized Report Card
As part of our client-centered approach, we provide you with timely feedback on the metrics that matter to you.
Inspector 5
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
3/24/2012 3/31/2012 4/7/2012 4/14/2012 4/21/2012 4/28/2012
Miles
per
Hour
Week Ending
QA Inspector Miles per Hour
Inspector 1
Inspector 2
Inspector 3
Inspector 4
Inspector 5
2438.40
2641.60
2844.80
3048.00
3251.20
3454.40
2256.39
2370.42
2493.57 2543.89
2582.45
2712.36
0.00
500.00
1000.00
1500.00
2000.00
2500.00
3000.00
3500.00
4000.00
Mileage
Goal
Week Ending
Mileage Goal vs Actual
Total Planned Miles